Bathroom remodeling in Dallas-Fort Worth
Waterproofing you will never see, tile you will look at every morning. We get both right.
Greater Texas Remodeling & Roofing remodels bathrooms across Dallas-Fort Worth: tub-to-shower conversions, walk-in showers, tile, glass, vanities and full gut remodels. Demolition, plumbing rough-in, waterproofing, tile and finish work are done in-house. Most full bathroom remodels take two to four weeks.

Who calls us for this
- Original 1970s and 80s bathrooms that need a full gut
- Tubs nobody uses that should be a walk-in shower
- Showers with soft walls, loose tile or a leak below
- Rental bathrooms that need a clean, durable refresh
What's included
- 01Free written estimate
- 02Demolition and haul-off
- 03Plumbing rough-in and waterproofing, tested before tile
- 04Tile, glass, vanity, fixtures and lighting
- 05Repair of any rot or water damage found behind the walls
What changes the price
You get a written estimate up front. If we open a wall and find rot, we show you photos and the cost before we fix it.
| Factor | Why it matters |
|---|---|
| Scope | A refresh with new vanity and fixtures costs far less than a full gut. |
| Moving plumbing | Keeping drains and supply lines where they are keeps cost down. |
| Tile | Large-format and patterned tile cost more in material and in labor. |
| What is behind the wall | Rotted subfloor or framing gets fixed before we close up, and priced before we do. |
Bathroom remodeling: photos from our jobs




Jobs and reviews



“The service was fantastic. Rick and his staff are very polite and attentive. No question went unanswered. Would highly recommend them to my friends and loved ones!!”
“Greater Texas Remodeling & Roofing Is The BEST Hands Down. Ricky & His Guys Came By Started With A Bang & Got The Job Done. Finished Early! Quick Turn Around! He Has Actual Full Time Employees That Do The Work. That Was Nice. Thanks Ricky”
From first call to final walk-through
The same five steps on a leaking roof or a full kitchen. Nothing gets signed until step three.
- 1
Inspect
A free visit. We get on the roof or into the room and look at the real situation.
- 2
Document
Photos, notes and a written scope you can keep, and use for a claim.
- 3
Explain
What we found in plain English, including when the answer is less work than you were told.
- 4
Build
Our own crew does the work: roofing, remodeling or repair.
- 5
Clean up
Magnet sweep, debris hauled, and a final walk-through together.
The longer answers
How long does a bathroom remodel take?
Most full bathroom remodels run two to four weeks depending on scope, layout changes and material lead times. Cosmetic refreshes can be much faster.
What if you find water damage during demolition?
It happens a lot in older bathrooms. We show you what we found, explain how to fix it, and fix it before the walls close. Covering rot with new tile is how bathrooms end up remodeled twice.
Bathroom remodeling: common questions
How long does a bathroom remodel take?
Most full bathroom remodels take two to four weeks, depending on scope, layout changes and how long materials take to arrive. Cosmetic updates can be faster.
Do you do tub-to-shower conversions?
Yes. Greater Texas handles the demolition, plumbing rough-in, waterproofing, tile, glass and finish work for tub-to-shower conversions.
Can you finish a bathroom remodel another contractor started?
Yes. We inspect what was done, point out anything that needs redoing, and give you a written plan and price to finish it properly.
Areas covered
Get a free estimate
Free roof inspections and free written estimates across Dallas-Fort Worth. No pressure, and no price that changes halfway through.
(214) 694-7056Call or text · Mon-Fri 9am to 7pm · Sat 9am to 6pm
